X-State
All developments

New builds · Białołęka · Dom Development

APARTAMENTY MYŚLIBORSKA PARK

+48 690 942 980

We call back every day, 10:00–18:00We speak English

from 553 632 zł

APARTAMENTY MYŚLIBORSKA PARK

Available apartments

125

Floor area

34,6 m² – 88,8 m²

Units in the project

166

Buildings

4

Completion

IV kw. 2027 (etap 1.1)

Sources for the project data: domd.pl, urbanity.pl, tabelaofert.pl

Description

Between the blocks of Tarchomin stands the oldest monument of this part of Warsaw. The Church of Saint James began to be built at the beginning of the 16th century — the date 1518 was found on one of the bricks in the presbytery wall — and was consecrated in 1582. Tarchomin itself appears in documents as early as the 13th century as a noble village of the Jastrzębcy, later the Wesłów, Zalewskich and Ossolińskich. It's worth knowing about this, because Białołęka is considered a district without history, yet it has a longer one than half of left-bank Warsaw.

The rest of the area is young and it shows. Tarchomin was built at the turn of the eighties and nineties, and new housing estates are still filling it out to this day. A communication breakthrough was the Maria Skłodowska-Curie Bridge, opened in March 2012, and the tram, which in January 2013 went to Metro Młociny, and in 2017 it was extended to Nowodwory. Access no longer depended solely on the Grota-Rowecki Bridge.

The advantage of this address is simple: lots of greenery, close to the Vistula River and embankments, larger square footage than for the same money on the other side of the river.

What to pay attention to: calculate the actual route to the tram stop and check places in nearby schools and kindergartens — Białołęka grew faster than its public infrastructure and this is the most common disappointment here after moving.

Żerań is associated by older Warsaw residents with one address: this is where the Personal Car Factory stood for half a century, from which Warszawy, Syreny and Polonezy drove out. The second hallmark of the district is the Żerański Canal, dug in the fifties and sixties to connect the Vistula River with the Zegrzyński Reservoir. The housing estate is being built at Myśliborska 11, between the one and the other.

The first stage consists of four buildings and one hundred sixty-six apartments, with a deadline for the fourth quarter of 2027. The buildings are low-rise, multi-family, with an underground garage. The heart of the development is to be a private park with two ponds, a beach and a playground, that is, a space that is usually not standard in Białołęka.

What is not visible in the visualizations: the park and ponds are being created together with subsequent stages, so the first residents will see them only after years. And something more important than greenery. Białołęka has no metro, and all traffic to the center goes through the bridges and Trasa Toruńska. During rush hours this is a real cost of this address, counted in quarter-hours, not in minutes. It's worth driving this route at eight in the morning, before signing the contract.

Prices and available apartments are in the table below, straight from the developer's price list.

Location

ul. Myśliborska 11

The area: Białołęka

Białołęka grew from villages on the edge of Warsaw into the city's youngest and fastest-growing district in two decades. Flats here are cheaper than anywhere else inside the city limits and more new estates are being built here than in any other district. Sometimes you pay for that in commuting time — and that is the first thing to check.

Read the area guide

Available apartments

24 of 125

Rooms
Budget550 000 zł – 1 330 000 zł

Ask about this development

Can't find your size? Leave your number — we'll pick from 5878 apartments by 15 developers.

We call back every day, 10:00–18:00We speak English

When should we call

Apartments straight from developers — no commission for the buyer. Prices update automatically from the price lists.

Informacja o przetwarzaniu danych (RODO)

Administratorem Twoich danych jest X·State Real Estate, kontakt: admin@xstate.pl. Dane z formularza przetwarzamy, żeby odpowiedzieć na zapytanie i przedstawić oferty (art. 6 ust. 1 lit. b i f RODO), przez czas rozmowy i trzy lata po jej zakończeniu — tyle trwa okres przedawnienia roszczeń.

Masz prawo dostępu do danych, ich sprostowania, usunięcia, ograniczenia przetwarzania, przenoszenia oraz wniesienia sprzeciwu, a także skargi do Prezesa Urzędu Ochrony Danych Osobowych. Podanie danych jest dobrowolne, ale bez numeru telefonu albo adresu e-mail nie mamy jak się odezwać. Szczegóły w Polityce prywatności.

Notify me about new apartments here

One email when something changes. No ads, one-click unsubscribe.

What's nearby

Bus

Dorodna 02

73 m · 1 min on foot · and 15 more within a kilometre

Kindergarten

Niepubliczne Przedszkole "Kraina Uśmiechu"

655 m · 8 min on foot · and 3 more within a kilometre

Convenience store

Żabka

126 m · 2 min on foot · and 5 more within a kilometre

Pharmacy

Dr. Optima

595 m · 7 min on foot

Clinic

NZOZ Poradnia Lekarzy Rodzinnych

586 m · 7 min on foot · and 1 more within a kilometre

Park

Park przy Lesie Bielańskim

1111 m · 14 min on foot

Sport

Morelowa Tennis Club

957 m · 12 min on foot

Distances measured in a straight line from the development, based on OpenStreetMap data. Walking time is an estimate — the real route may be longer.

Frequently asked questions about APARTAMENTY MYŚLIBORSKA PARK

How much does an apartment in APARTAMENTY MYŚLIBORSKA PARK cost
Developer price list runs from 553 632 zł to 1 323 418 zł. The lowest price per square metre is 13 950 zł/m². Price list as of November 3, 2026.
How many apartments are still available
The price list holds 125 apartments: from 34,6 m² to 88,8 m², 2 to 5 rooms. The full list with prices is on this page and we refresh it daily.
When is the handover date
The developer Dom Development gives the date as IV kw. 2027 (etap 1.1).
How far is public transport
The nearest bus stop is 73 m away, about 1 min on foot. Distance measured in a straight line from OpenStreetMap data.
Does the buyer pay a commission
No. With a new-build apartment the developer pays the commission, not the buyer — the price is the same as in the on-site sales office, and we handle the case from choosing the unit to the handover.
Who is building APARTAMENTY MYŚLIBORSKA PARK
The developer is Dom Development. The development is in Białołęka, Warszawa.

Other developments in Białołęka